Company News

CNE met with Singapore EDB

23 May 2024

Share Article

On May 21, GUI Kai, Executive Director and CEO, CHEN Shengjun, CTO and Vice President, and PENG Lian, General Manager of the International Business Department of CNE met with Mr. CHUA Zong Lun, Regional Vice President, Mr. Nicolas ANG, Regional Vice President, and Ms. Sarah CHUA, Regional Director of Singapore Economic Development Board (EDB) in CNE’s Beijing Office.

The two sides had an in-depth discussion on CNE’s international business strategic planning and the future development of the Singapore Research Institute and other aspects of exchange and cooperation. EDB expressed the hope that both sides would continue to deepen cooperation and expand cooperation areas.

Singapore Economic Development Board (EDB), established in 1961, is a statutory body under Singapore’s Ministry of Trade and Industry. EDB is the lead agency responsible for formulating and implementing business and investment strategies to help strengthen Singapore’s position as a global hub for business and investment.

Related Articles

CNE Concord New Energy Logo placeholder
Company News

Addressing Industry Challenges with Multi-Pronged Strategies and Advancing Global Expansion

Concord New Energy Group Limited (“CNE” or the “Group”; Stock Codes: 0182.HK, SEG.SG) announced its annual results for the year ended 31 December 2025. During the period, China’s installed power capacity…
Company News

Concord New Energy Named in S&P Global Sustainability Yearbook 2026 for the First Time, Singapore’s Sole Electric Utilities Company

Concord New Energy Group (“Concord New Energy” or "Group") (0182.HK, SEG.SG) has been included in The Sustainability Yearbook 2026 by the international authoritative rating agency S&P Global for the first time, marking…
Company News

CNE Group’s First Industrial Rooftop Solar Power Plant in Singapore Commences Operation

CNE Group's first industrial rooftop solar power project in Singapore's Tuas Industrial Estate successfully connected to the grid on March 2nd. The 2.6MWp installed capacity is expected to generate 3.2GWh…
Load More Articles